The Salish Kootenai College Campus
Tribal Colleges housed in abandoned buildings and makeshift classrooms follow in the historical footsteps of America’s junior and community colleges. Northern Colorado University at Greeley claims to be the first public two-year college and was housed in an abandoned barn. Bradley Institute in Peoria, Illinois, is one of the first private two-year colleges and was also housed in an abandoned building.
The first home of Salish Kootenai College was an old elementary school building in Poison, Montana. The building has since been torn down. Early in the college’s development one of the main classrooms was the conference room in the tribal jail. The college then moved to a vacant elementary building in Ronan.
Today, however, the college looks very different. From this modest beginning, Salish Kootenai now has its own campus near tribal government offices in the small community of Pablo. The transition from a jail to five new and attractive buildings is due to some important federal support, but also to the creativity and skill of the college’s staff and students. It is these people who actually designed and built Salish Kootenai College.
Salish Kootenai College was awarded, early in its development, a vocational education grant from the one percent set-aside program for Indian tribes and Indian organizations. A component of the grant was a building trades program. It was through this program that the college was able to successfully address some of its building needs.
The college implemented a building fee to be charged to students. The building fee started out as only $3 per student but has grown to $50 per student. In all likelihood it will be increased to $60-$75. This past year the fee raised $43,560. We have learned from representatives of D.A. Davidson that the source of funds to be utilized to pay off building bonds or loans should be at least 125 percent more than the annual loan payment.
The first buildings constructed by the building trades department was a carpentry shop and a six-stall garage. Next, plans were made to construct a general classroom building that would be 60 feet by 120 feet. This dimension was used because it seemed like a size that was within the construction limits of our building trades department. We used straight lines in wall construction and did not attempt any out of the ordinary construction.
Part of the building trades curriculum was building design and blueprint reading. The classes, with the aid of the instructors, designed the building. Frequent meetings were held with the administrative staff to determine the space allocation and location for the various functions that the building was going to perform. The result of this process was the final design of a classroom building with faculty offices and a student lounge area.
The class then developed a material list and a labor cost estimate. They did this as though they were the contractor bidding on the project. This list became invaluable later when a proposal was developed for library construction.
The college then advertised to award 10 grants to students in building trades. The grant would pay each student $100 per week for each week in school. The grant would also pay tuition and fees for each participant. Each recipient of a grant was to enroll full-time in the building trades program, work 20 hours each week on the project, and attend required classes. The building trades program requires that each student do 10 hours per week of relevant laboratory work. They did this lab requirement on the building project. The college thus got 30 hours of work from each student per week, while each student earned 12 credits per quarter in building trades.
As the result of our advertising for grant applications from prospective students, we received 55 applications. From these applications we screened 25 to be interviewed. Ten very good students were selected to work on the project.
The building trades instructors taught the students to work as though they were on a private industry construction project. Time sheets were kept on their work and they were paid only for the hours they worked. The department had two instructors and one teaching aide. One of the instructors took care of all of the budding and purchasing of materials and work with subcontractors. The other instructor served as the construction foreman. The construction jargon for this is: “One person purchases and the other person pushes.” It is very difficult for one person to do both.
As the project developed, and as the whole college watched, the students and instructors became very proud of their work and they worked very diligently. The project started on the first day of fall quarter and it was completed by the end of spring quarter.
Tremendous savings were enjoyed by the College. The estimated cost of the building was $34 per square foot and we were able to build it for $24 per square foot. Our labor costs were less than$30,000 for the student trainees. The instructors ‘and the aide’s salaries were charged to the vocational education grant. We did not have any architectural costs. It was all designed by the instructors and classes. Much of the cost of the trainees was recaptured by the reimbursement to the college by the Bureau of Indian Affairs because they were Indian students. A representative of a financial institution appraised the building at $800,000 and Salish Kootenai College had invested $230,000.
The actual cost of the building was the materials, the electrical work, the carpet laying, and some other minor subcontracts.
This same plan was followed for the construction of the tribal library that is located on our campus. Presently we are constructing a science classroom building that will have a variety of other functions. We are planning to construct the 22,200 square foot building for $500,000, which will be a cost of about $23 per square foot.
If the tribal colleges are going to meet their building needs, they must find innovative ways to meet these needs. This is one way that might work for some of the colleges.
Joseph McDonald is president of Salish Kootenai College in Pablo, Montana.